Martinuscreed schreef op 29 november 2022 13:40:
29 November 2022.JT Deposit Infill & Expansion Highlights. De 18.76 g/t Au is een intersection drill hole, maar super HIGH!!!!
120.5m at 18.76 g/t Au, 0.55% Cu, 3.86% Zn, 0.93% Pb, 6 g/t Ag (22.1 g/t AuEq) in hole JT22-152, including
10.0m at 39.79 g/t Au, 1.06% Cu, 17.02% Zn, 2.54% Pb, 18 g/t Ag (52.2 g/t AuEq), and
19.1m at 43.87 g/t Au, 0.27% Cu, 2.20% Zn, 0.69% Pb, 6 g/t Ag (43.3 g/t AuEq), and
13.5m at 0.48% Cu, 1.26% Zn (1.56 g/t AuEq) in footwall copper zone, in hole JT22-152
9.3m at 7.18 g/t Au, 0.22% Cu, 5.57% Zn (10.9 g/t AuEq), in hole JT22-148, including
6.6m at 10.02 g/t Au, 0.29% Cu, 7.30% Zn (14.85 g/t AuEq), and
30.4m at 0.48% Cu and 0.92% Zn (1.33 g/t AuEq) in footwall copper zone, in hole JT22-148
5.3m at 0.65 g/t Au, 20 g/t Ag, 1.72% Cu, 0.57% Zn (3.2 g/t AuEq), in hole JT22-149